Steel Buildings Made Easy

Buying a steel building involves some important decisions, but it doesn’t need to be complicated. We’ll help you define the building you need, coordinate the engineering and drawings, and keep you informed as your project progresses through manufacture and delivery.

You don’t need to have every detail worked out before contacting us. Give us the basics about your project and we’ll help you develop the building specification from there.

Your payments are staged as your project progresses, so you’ll know what is due and when.
Your individual order documentation will confirm the payment schedule applicable to your building.

01

INITIAL DEPOSIT

Typically 15%

Paid when your order is placed, allowing your project to get underway and move into the design and engineering process.

02

STAGE PAYMENT

Following Design & Approval

Your second payment becomes due once your project reaches the relevant approval stage and is ready to progress into procurement and manufacture.

03

FINAL BALANCE

Approx 1 Week Before Delivery

The remaining balance is due ahead of your confirmed delivery in accordance with your order documentation.

No surprises.

We’ll keep you informed as each payment stage approaches, and every payment is deducted from your total invoice balance.

Close-up of architect's hands drawing plans with ruler and pencil, focusing on intricate design details.

Before your building enters manufacture, we prepare the project drawings for you to review and approve.

Your Base Layout is issued first, showing the building footprint, column positions and foundation setting-out information.

We then prepare your General Arrangement drawings, detailing the building dimensions, frame layout, elevations, doors, openings and other key elements of your agreed specification.

You’ll have the opportunity to check everything carefully and request any necessary amendments before giving us your approval to proceed.

Manufacture only begins once the required drawings have been approved.

Setting Out Your Building

Your Base Layout is issued first, showing the building footprint, column positions and the key setting-out information required for your foundations.

Check Every Detail

Your GA drawings show the overall building dimensions, elevations, frame arrangement, doors, openings and other key details for you to review and approve.

Confirming Your Doors

We’ll confirm the information required for your doors, including opening sizes, operation, colours and other relevant details before they are ordered.

Ready for the Build

For self-build projects, we provide the relevant construction drawings, component information and 3D model files to help you understand how the building goes together.

We won’t release your building for manufacture until the required drawings have been checked and approved by you.

Once the required drawings have been approved, your building can be released for manufacture.

The structural frame, cladding, flashings and associated components are produced to your approved project specification, ready to come together as your complete steel building package.

Because every ESB building is made to order, rather than taken from stock, the production programme is specific to your project.

Throughout this stage, we’ll keep you informed of progress and begin coordinating the information needed for delivery.


Your building is manufactured to the specification and drawings you approved — not pulled from a shelf as a standard-size building.

As your building progresses through manufacture, we’ll start coordinating the practical arrangements for getting everything safely to your site.

We’ll confirm the delivery address, site access and relevant transport information, along with anything we need to know about the site before dispatch.

Once production is nearing completion, we’ll work with you to agree the planned delivery date so you have time to prepare the site, unloading arrangements and labour required.

You’ll receive the relevant delivery information beforehand, so you know what’s arriving, when to expect it and what needs to be ready.


No Surprise Lorries.
We coordinate delivery with you in advance — your building doesn’t simply turn up at the gate.

steel building transport
whatsapp image 2020 06 24 at 18.25.30 (2)

Your steel building package is delivered to site on the agreed delivery date, ready for unloading and the next stage of your project.

Beforehand, we’ll provide the relevant delivery information so you know what to expect and can make sure the site is ready to receive the building.

As steel building components can be large and heavy, suitable site access and unloading arrangements need to be in place for the delivery vehicle.

Whether you’re managing the build yourself or working with an erector, you’ll have the drawings and project information needed to move forward.


Delivered. Ready for the Next Stage.

Your building is now on site — and our support doesn’t disappear with the delivery lorry.

Support Beyond Delivery.

From the first quotation to the building arriving on site — and afterwards — you’ll still know who to call.

Delivery doesn’t mark the end of our involvement. Once your building is on site, we remain available to help with questions relating to the supplied building, drawings and components as your project moves forward.

If something needs clarifying during erection, you can come back to us and we’ll help with the relevant project information wherever we can.

Your drawings and documentation remain an important reference throughout the build, whether you’re managing the project yourself or working with an experienced steel building erector.

Tell us what you’re looking to build and we’ll help you take the first step — from developing the initial specification and quotation through to design, manufacture and delivery.